Тематическая подборка
High-hashrate and hydro-cooled miners built to run in a data center, not a living room. Deploy into LeedMiner's partner hosting facilities at $0.06–$0.08/kWh all-in — no noise, cooling, or electrical-upgrade overhead.



Antminer S23 Hyd 3U (1.16Ph)
Bitmain



Antminer S21e XP Hyd 3U(860Th)
Bitmain



Sealminer A2 Pro Hyd (516Th)
Bitdeer



Antminer S19 XP Hyd 3U (512Th)
Bitmain



Antminer S21 XP+ HYD (500Th)
Bitmain



Antminer S21 XP Hyd (473Th)
Bitmain



Whatsminer M63S++ (468Th)
MicroBT



Sealminer A2 Hyd (446Th)
Bitdeer



Antminer S21e XP HYD (430Th)
Bitmain



Whatsminer M63S (396Th)
MicroBT



Antminer S21+ HYD (395Th)
Bitmain



Antminer S21+ HYD (358Th)
Bitmain



Whatsminer M53S++ (356Th)
MicroBT



Whatsminer M66S++ (356Th)
MicroBT




VolcMiner D1 Hydro (30.4Gh)
VolcMiner



Whatsminer M53S++ (354Th)
MicroBT



Antminer S21 Hyd (335Th)
Bitmain



Whatsminer M63 (334Th)
MicroBT



Whatsminer M66S+ (322Th)
MicroBT



Antminer S21+ HYD (319Th)
Bitmain



Antminer S21 Hyd (319Th)
Bitmain



Whatsminer M66S (302Th)
MicroBT



Antminer S21 Hyd (302Th)
Bitmain



Whatsminer M66S (300Th)
MicroBT
LeedMiner's partner data centers charge $0.06–$0.08/kWh all-in depending on region, commitment, and power tier. A concrete per-miner monthly figure is included with every hosting quote.
Hydro-cooled miners run hotter, quieter, and more efficiently than air units — but they require a facility with hydro loops. Managed hosting is the lowest-friction way to deploy them without building your own plumbing.
Yes. Contact our team with the model, quantity, and destination — we'll route it into a facility that can accept your specific power draw and cooling profile.